Captive Cogeneration Power Plant & Waste to Energy Power Plants

Ditap-V has supplied DCS / PLC System, Field Instruments & Electrical Panels right from 1MW to 25MW capacity cogeneration plants.

Also supplied Automation & Field Instrumentation system for Waste to Energy Power Plants.

For cogeneration Plant Automation supplied for all the sections in Bagasse fired / Coal fired boiler process i.e. three elements drum level control, Single element control, Super-Heated Steam temperature control, Steam Pressure control, ESP, Bagasse / Coal Feed control, Furnace draft control, Soot blower pressure, Dearator Level, Dearator Pressure, CBD & IBD tank, PRDS inlet & outlet Pressure and temperature, HP heater parameters, ID, FD, SA fan control, turbine automation, Air compressor, Ash & Coal handling section controls.

Synchronization of Governor panel, vibration monitoring system, electrical panels, energy meters, AVR relays, temperature scanner, relay panel, etc. with main DCS system.

Power / Energy Management system for monitoring & operation of electrical feeders, critical load management, synchronizing, etc. Basic Asset management system for Plant performance monitoring.

Clients – M/s. Kisanveer Sugar, M/s. Utopian Sugar, M/s. BGR Energy, M/s. APGENCO, M/s. NTPC & many more

Typical DCS system configuration diagram for the Cogen- Power Plant.

 

The Way We Think                                                             
"We at Ditap-V believe that the best is never enough"

Get In Touch

Tel. : 020 - 24362773 / 74
Fax : 020 - 24362775
Email: cmk@ditapv.com
projects@ditapv.com